• 11 Saqqalia St,Makram Abaid, Nasr City, Cairo, Egypt
  • [email protected]
  • +202-22 737 737
  • Download Profile

Atecegypt

  • Home
  • Atec
    • About Us
    • CEO Message
    • Our Value
    • Our Vision
    • Our Mission
  • Services
    • Supply & Install Medium Voltage Equipment
    • Maintenance
    • Retrofit
    • Approval & Compliance
    • Electrical Engineering Consultation
  • Products
    • Transformers
      • Dry Transformer
      • Oil Transformer
    • Medium Voltage Switchgear
      • Primary Switchgear
      • Secondary Switchgear
    • Low Voltage Switchgear
      • Low Voltage Panel
    • Compact Sub Station (Kiosk)
      • Electrical Kiosk
    • Cables
      • Medium Voltage Cables
      • Low Voltage Cables
    • Busway
      • Busway
  • Partners
  • Projects
    • Residential
    • Educational
    • Commercial
    • Industrial
  • Blog
  • Contact Us
black-arrow عربي

Al Monairy Corn Products Factory – 10th of Ramadan

Home Blog
2025-01-20 2025-01-20

Al Monairy Corn Products Factory – 10th of Ramadan

At Atec Egypt, we take pride in powering industrial excellence across Egypt. One of our notable recent projects is the full electrical supply and installation for Al Monairy for Corn Products, a major food production facility located in 10th of Ramadan City.

Project Overview

The facility specializes in corn-based food manufacturing and required a robust electrical infrastructure to support its high-capacity operations. Atec Egypt was selected to handle the complete medium and low voltage electrical works, ensuring reliability, safety, and compliance with all relevant standards.

Scope of Work

Medium Voltage Supply & Installation

  • Supplied and installed (4) 3000 kVA HITACHI oil-immersed transformers

  • Supplied and installed (4) medium voltage Ring Main Units (RMUs)

  • Completed installation of all electrical rooms, including:

  • Earthing systems

  • Internal connections

  • Compliance with Canal EDC standards

Low Voltage Distribution

  • Supplied and installed (4) Main Distribution Boards (MDBs) with 6300A main circuit breakers

  • Supplied and installed multiple sub-panels to manage internal load distribution

  • Installed low voltage power cables using structured cable ladders and trays across the site

Earthing & Lightning Protection

  • Executed 3 dedicated earthing systems:

    • One for the main buildings

    • One for the light current systems

    • One for the lightning protection (مانع صواعق) system

Outcome

The result was a fully integrated electrical power system capable of supporting continuous industrial operations. All works were delivered in full compliance with Canal EDC requirements, ensuring safety, efficiency, and long-term durability.

Next blog Al Amal Al Sharif For Plastics Factory- 10th of Ramadan City

Search

Latest Blogs

  • Al Amal Al Sharif For…
  • Al Monairy Corn Products Factory… 2025-01-20
Call 123 234-567-890

We Provide

Best Services

black-arrow Contact us Now

Subscribe to Our
Newsletter

Atecegypt Pages

  • Home
  • About Us
  • Our Vision
  • Partners
  • Blog
  • Contact Us

Working Time

  • Sun - Thurs: 9.00am - 5.00pm
  • Friday - Saturday Closed

Say Hello

+202-227 07 212
[email protected]
Copyright © 2025  New Vision IT. All Rights Reserved.